Richardson Inspection Services does not process online applications for Donegal Township. Please reach out to the municipality for the application process.
724-445-7303
donegaltwp@zoominternet.net
Richardson Inspection Services does not process zoning applications for this township. Please contact your municipality to obtain zoning approval.
Accepted alterations:
Any other alterations REQUIRE a building permit: Including electrical, plumbing, and mechanical.
Please Note a copy of the plans, drawings, or material list is required to process the application.
If documents are not available this application can be saved and continued at a later date by clicking the save button below.
NOTE: The contractor or individual is responsible to fill and maintain the existing grade. The contractor or individual agrees to dispose of all waste materials in an approved and accepted manner. The contractor or individual is responsible for disconnecting and capping (if applicable) all utilities.
NOTE: DEP requires a 2-week advanced notice before demolition may begin (asbestos abatement for all commercial projects).
NOTE: A certificate of insurance is needed if a contractor is performing the demolition.
A SIGNED Asbestos Abatement form? (not required for residential) – required for ALL commercial structuresHas the contractor provided proper insurance? Required for all contractors, please attach Has the PA one-call been made? (required if the soil is disturbed) 1-800-242-1776
IN ORDER FOR THIS STRUCTURE TO BE REMOVED FROM THE TAX ROLLAN APPROVED FINAL INSPECTION IS REQUIRED. 3303.4 Vacant lot.Where a structure has been demolished or removed, the vacant lot shall be filled and maintained to the existing grade or in accordance with the ordinances of the jurisdiction having authority.
I hereby certify as the owner that the proposed work is authorized.